Steady progress this week.  The biggest construction task was the laying
of the new loggia stairs, which in their finished form, look extremely smart.  
The main drive was dug up for possibly the fifth time in order to connect
gas pipes to the lower floor boilers.  The cottage been given its first coat of
paint.  This is in a very pale green.  After looking at white plaster walls for
so long, the initial reaction to the colour is alarm.     
Loggia stairs now complete.  The loggia
itself will be re-tiled this coming week.
Water pipes for the two
bathrooms on the first floor.
The interior of the cottage has
received its first coat of paint.
Gas for the boilers located under the
loggia stairs now connected.
Interior of the forno a legna almost
ready for the first test burn.
Chimney pipe
for the library
the library
cemented
stufa into the
wall.
Bathroom for the second bedroom on
the first floor.
Bath and surround installed for the
main bedroom's bathroom.
Building Project Update - 11 November 2007